Free returns for 10 days

No-cost EMI · Free delivery and installation

Boon Airvana™ Smart Air Purifier in White — image 1
Boon Airvana™ Smart Air Purifier in White — image 2
Boon Airvana™ Smart Air Purifier in White — image 3
Boon Airvana™ Smart Air Purifier in White — image 4
Boon Airvana™ Smart Air Purifier in White — image 5
Boon Airvana™ Smart Air Purifier in White — image 6
Boon Airvana™ Smart Air Purifier in White — image 7

Smart dual-HEPA air purifier with AtmoScan™ Level 8 sensing

Boon Airvana™ Smart Air Purifier

It reads the room.

4.92 · 74 reviews

Meet Boon Airvana, India's first dual-filter, Level 8 sensing air purifier, with a live AQI display and app, for rooms up to 484 sq ft.

L8the top level of purifier sensing — laser-counted particles, gases and climate, where most purifiers stop at a basic dust sensor.

₹14,900₹19,900Sale

Inclusive of all taxes · Free shipping and installation

Pay monthly

  • ₹2,484/mo

    6 mo · No-cost

  • ₹1,338/mo*

    12 months

  • ₹510/mo*

    36 months

*Estimated at 14% yearly interest; your bank’s rate may be higher. The exact amount is shown at checkout.

Add to Cart

Secure checkout on helloboon.com · Razorpay

  • Delivery in 2 Business Hours · Delhi NCR
  • Cash on Delivery
  • Free Shipping
  • 7-Year Motor Warranty
  • 1-Year Electrical Warranty
  • BIS Certified
  • AtmoScan™ Level 8 Sensing
  • Smart Alerts · Boon App
  • Google HomeAmazon Alexa
  • True HEPA · Dual Filter

Boon Airvana™ Smart Air Purifier

₹14,900

Add to Cart

Watch

Meet Boon Airvana™.

At a glance

One purifier. Everything built in.

1

Air purifier

A purifier and a complete air-quality monitor, in one compact unit.

2

HEPA filters

Fed from both sides. India's first dual-filter system, with 2X longer filter life.

8

Air readings

PM1.0, PM2.5, PM10, TVOCs, NO₂, eCO₂, temperature and humidity, every second.

3

App, Alexa & screen

Control it from the Boon app, by voice with Alexa or Google Home, or on the unit's display.

AtmoScan™ · Level 8 Sensing

The city's AQI isn't yours. Get your own.

AtmoScan™ is India's first Level 8 air sensor: a full air quality monitoring station in your home. It tracks 8 parameters, with a precision laser counting particles every second. Two years of research went into it.

L8

the top of the sensing ladder

3 sizes

of particle, counted by laser

1 sec

between readings, day and night

A hand holding the Boon app up in front of Boon Airvana™: Mumbai's outdoor AQI of 356, the room's AQI of 39 after Airvana™, and the same 39 on the unit's display

The eight levels of purifier sensing

The eight levels of purifier sensing: which readings each level takes. Level 8: The top of an 8-level sensing ladder. Level 1 is a basic dust sensor with a light. Each level adds more, until Level 8 reads PM1, PM2.5, PM10, temperature, humidity, VOCs, CO₂ and NO₂.
LevelPM2.5PM10°CRHPM1VOCCO₂NO₂
L8Laser
L7Laser
L6Laser
L5Laser
L4Laser
L3Laser
L2IR
L1LED

Level 8: The top of an 8-level sensing ladder. Level 1 is a basic dust sensor with a light. Each level adds more, until Level 8 reads PM1, PM2.5, PM10, temperature, humidity, VOCs, CO₂ and NO₂.

  • LEDDust sensor with an indicator light — no readings
  • IRInfrared dust sensor
  • LaserLaser particle counter
  • Particles

    PM1 · Ultrafine particles

    The finest particles, the ones that travel deepest into your lungs.

  • Particles

    PM2.5 · Fine particles

    The number everyone quotes, measured with a laser instead of the dust sensor most purifiers rely on.

  • Particles

    PM10 · Coarse particles

    Dust, pollen and the bigger particles you can sometimes see.

  • Gases

    VOCs · Volatile organic compounds

    Cooking fumes and chemical vapours that particle sensors simply can't detect.

  • Gases

    CO₂ · Carbon dioxide (estimated)

    Been in a closed room too long? Airvana tells you when to let fresh air in.

  • Gases

    NO₂ · Nitrogen dioxide

    Traffic and exhaust, the pollution that drifts in from the road.

  • Climate

    °C · RH · Temperature and humidity

    The comfort numbers. Low humidity means dry skin, eyes and throat. Airvana spots it first.

  • Particles

    Counts · Particle counts

    Beyond the readings, Airvana estimates how many particles of each size are in your air.

Allergens

Made for allergy season.

Pollen, house dust and pet dander are particles, and particles are what a laser counts best. AtmoScan™ tracks them at three sizes, so Airvana™ sees a rise the moment it starts, turns the fan up, and the allergy alert tells you why. No sensor can tell pollen from dust by what it is made of — it can catch the sizes they come in.

PM10Coarse particles
The size range of pollen and household dust.
PM2.5Fine particles
Smoke and fine dust, small enough to stay in the air for hours.
HEPATrue HEPA filter
Captures 99.95% of particles on a single pass, behind a reusable pre-filter that traps hair and coarse dust.

Dual Filter

One filter is a bottleneck. Airvana has two.

India's first dual-filter air purifier draws air in from both sides through two full filter sets. Double the filter life and 360° coverage.

Dual-suction airflow

A high-suction motor pulls air in from two directions at once, so no corner of the room gets left behind.

Smallest body in its class

Dual-filter purification in the smallest body among its peers.

Four layers, one job

A reusable pre-filter mesh you clean with a dry cloth, an anti-bacterial coating that keeps the HEPA from fouling, true HEPA and activated carbon for gases and odours.

360° coverage

Two intakes mean clean air reaches every side of the room, not just the side the purifier faces.

99.95% in a single pass

The true HEPA layer captures 99.95% of particles every time air passes through.

2X

longer filter life than standard single-filter purifiers — India's first dual-filter system.

Why two

Two filters, half the load each.

Everything a purifier removes ends up on its filter. With one filter, that is one surface doing all the work.

Airvana™ draws air in from both sides through two filters. The room is cleaned faster and more evenly, each filter carries half the load, and a reusable mesh in front keeps hair and coarse dust off them altogether.

Two filters share the work

Boon Airvana™

A dual-filter system, fed from both sides. The load is split, so it lasts 2X longer.

Standard purifier

One filter takes everything the room produces, and is spent sooner.

The big stuff never reaches the HEPA

Boon Airvana™

A reusable mesh traps large dust and hair first. Wipe it with a dry cloth, refit it, and the main filter lasts longer.

Standard purifier

Hair and coarse dust load the main filter directly, and are thrown away with it.

A filter grade you can check

Boon Airvana™

True HEPA — a stated grade, capturing 99.95% of particles on a single pass.

“HEPA-type”

A marketing term, not a grade. It promises nothing you can measure.

Size a purifier for your room

The Purifier

Clean air, from both sides.

Most purifiers pull air through one face and one filter. Airvana™ pulls from two.

A finger pressing the touch controls on top of Boon Airvana™, beside its round display

01

Dual-suction airflow

Air is drawn in from both sides of the unit, for faster, more even room coverage.

02

Dual-filter system

India's first. Two filters share the work and last 2X longer than a standard single filter.

03

Reusable pre-filter mesh

Traps large dust particles and hair before they reach the main filter, which extends its life. Wipe it with a dry cloth and put it back.

04

Compact design

The smallest in its category.

Where it fits

Sized for the rooms you actually live in.

Built for rooms up to about 484 sq ft, and for the bedroom, where a purifier matters most — from a unit that is the smallest in its category.

Boon Airvana™ beside a seated person, its display reading AQI 39

Bedrooms and nurseries

The eight hours a purifier matters most, and Sleep mode is built for the night.

Living rooms

Dual-suction airflow pulls from both sides of the unit, for faster and more even coverage across a room of up to about 484 sq ft.

Open kitchens and homes near traffic

The cooking fume alert catches smoke and fumes from the kitchen; the traffic pollution alert flags vehicle exhaust as it comes in.

Design & Engineering

Two firsts, in the smallest body in its class.

The display tells you how the air is at a glance: the number is the live AQI from AtmoScan™, and the colour moves from green through yellow to red as the air gets worse.

India's first dual-filter system

Two filters instead of one. The load is shared, so the system lasts 2X longer than standard single-filter purifiers.

India's first air purifier with a Level 8 sensor

A complete air-quality monitor, built in. AtmoScan™ tracks PM1.0, PM2.5, PM10, TVOCs, NO₂, eCO₂, temperature and humidity together, every second — so you know exactly what is in your air, not just how much dust.

Self-diagnostics

Airvana™ checks its own sensors, filters and motor continuously, and catches a fault the moment it appears — before it becomes a bigger problem.

Dual-suction airflow

A high-suction impeller draws air in from both sides, for faster and more even room coverage — and Auto mode sets its speed from what the sensor reads.

Compact design

The smallest in its category.

A display worth looking at

A full-colour IPS TFT LCD with multiple selectable watch faces.

Works with your smart home

Google Home and Amazon Alexa, plus the Boon app. Apple HomeKit expected soon.

  • Google Home
  • Amazon Alexa

The Display

A screen worth leaving on.

A first-of-its-kind full-colour LED display shows exactly what's in your room, right now. Switch faces, follow the graphs or check your Boon Score.

The touch buttons on top of Boon Airvana™: Timer, Live, Pair, Modes, Lock, Intensity and Power, each under its indicator light
Airvana™ display: a timer set for 04:00Airvana™ display in Sleep mode: a crescent moon over the word Goodnight
  1. 01 · Timer

    Timer

    Switches Airvana™ off after 1, 4 or 8 hours.

  2. 02 · Live

    Everything at once

    AQI, PM1, PM10, your mode and any alerts, all on one screen.

  3. 03 · Live

    Humidity

    The room's humidity as one big number, with a tag that says how it's doing.

  4. 04 · Modes

    Modes

    Each press moves to the next mode: Light, Sleep, Eco, then Auto.

  5. 05 · Intensity

    Fan speed

    Sets the fan speed, from I to IV.

Boon Score

One number for how healthy your home's air is, right on the display.

Smart Alerts

Heads-up, not hindsight.

Most purifiers show you one number. Airvana™ tells you what is happening in your room, and what to do about it, on the display and in the app.

Four alerts about your air

Each one reads a different part of what AtmoScan™ measures: CO₂, gases, traffic exhaust and fine particles.

CO₂Fresh air alert
Room closed up too long? Every breath adds CO₂, and no purifier can filter it out. Airvana™ tells you the moment CO₂ builds up too far, so you know it is time to open a window.
VOCCooking fume alert
Too much tadka in the air? Frying, smoke and incense fill the house with fumes a dust sensor cannot see. Airvana™ catches them as they happen and, in Auto, turns the fan up to clear them. It has your back.
NO₂Traffic pollution alert
Rush hour outside? Exhaust drifts in from the road. Airvana™ tells you when it is coming in, so you know to shut the windows.
PM2.5 & PM10Allergy alert
Sneezing again? When dust and pollen-sized particles rise in the room, Airvana™ warns you and, in Auto, turns the fan up to bring them back down.

Three more about Airvana itself

Filter health
Never guess when to change a filter. Airvana™ tracks it live and reminds you before it is due.
Clean pre-filter reminder
Dusty week? Airvana™ tells you when the pre-filter mesh needs a wipe with a dry cloth.
Self-diagnostics
Something not right? Airvana™ checks every sensor, every filter and the motor, and alerts you the moment anything fails.

What changes

Less guessing. Cleaner air.

Four things you will notice that a PM2.5 light never told you.

You know when to open a window

The fresh air alert reads CO₂, and tells you when a closed or crowded room needs outdoor air.

Dinner does not linger

The cooking fume alert picks up smoke and fumes from the kitchen as they happen.

You see the road come in

The traffic pollution alert flags vehicle exhaust entering your home.

Fewer filter changes

A dual-filter system that lasts 2X longer, and a pre-filter you wipe clean instead of replace.

Smart Modes

Alerts tell you. Auto acts.

In Auto, Airvana™ sets its own fan speed from everything AtmoScan™ reads, from PM1 to the gases most purifiers can't detect. Sleep and Eco look after the night and the electricity bill.

Auto
Fan speed adapts in real time to what AtmoScan™ sees.
Sleep
Whisper-quiet operation for an undisturbed night.
Eco
Switches off when the air is clean and back on when it isn't, to save electricity.

Boon App · Air AI

Airvana gets home before you do.

Boon Air AI learns when you come home and starts purifying before you arrive, so your room is clean and ready when you walk in.

Boon app home screen for Boon Airvana™ in the living room: the city's outdoor AQI at the top, the room's AQI after Airvana™ in a glowing teal column below, with humidity and temperatureBoon Air Score screen: a score inside a ring of dots, tagged with streaks, monthly report, on-time care and filter health, above today's AQI
  1. 01 · Home

    Your room, in one calm number.

    Your city's outdoor AQI at the top, your room's AQI after Airvana™ below it, with humidity and temperature. The gap between the two numbers is your Airvana™ at work.

  2. 02 · Boon Score

    One number for a healthier home.

    Boon Air Score rolls your air, your filter's health and on-time care into one number, with streaks and a monthly report. Know at a glance how home is doing, and watch it climb.

  • Switch modes and set the child lock without touching the unit.
  • Schedule the purifier, and get an alert the moment your air changes.
  • Auto-learn mode learns your routine and starts purifying before you get home.
  • Run diagnostics and filter health checks, with a clear report on demand.
  • Insight cards — charts, trends and shareable cards, like how much cleaner your air got this week.
  • Works with your smart home: connects with Google Home and Amazon Alexa, with Apple HomeKit expected soon.

Works with your smart home.

Add Airvana™ to the smart home you already use, alongside the Boon app.

  • Google Home

  • Amazon Alexa

  • Apple HomeKit

    Expected soon

Boon Labs

Built by the lab that cleans water for 400+ hotels.

Boon Labs is a DSIR-accredited R&D lab, backed by 7 patents and trusted by 4,000+ organisations across 9 countries. Airvana is the same discipline, aimed at the air you breathe.

400+

Hotels worldwide

4,000+

Organisations served

9

Countries

70+

Cities with on-ground service

Our clientele

Trusted by the world's most discerning brands.

From Fortune 500 headquarters to the world's finest hotels, Boon is the hydration partner behind the glass.

Organizations served
4,000+Organizations served
Hotels worldwide
400+Hotels worldwide
Corporate accounts
200+Corporate accounts
Countries
9Countries

Corporate

Google
McKinsey & Company
BCG
Qualcomm
Nestlé
Bain & Company
EY
BMW
Bosch
GSK
Deutsche Bank
ICICI Bank
Nomura

Hospitality

Oberoi
Aman
St. Regis
Six Senses
Four Seasons
Taj Hotels
Ritz-Carlton
JW Marriott
The Leela
Hilton
Raffles
Fairmont
InterContinental
Holiday Inn
Lemon Tree
Grand Hyatt
Andaz
andBeyond

A selection of Boon accounts. Client marks are the property of their respective owners.

Compare

Only one of them reads all 8.

Boon Airvana™: 8 parameters, Level 8. Xiaomi, Dyson and Coway: four at most.

Boon Airvana™ vs

Boon Airvana™ compared with Xiaomi Smart Air Purifier 4
FeatureBoon Airvana™Xiaomi Smart Air Purifier 4
SensingOnly Boon Airvana™
8 parameters
  • PM1.0, PM2.5, PM10, TVOC, NO₂, eCO₂, temperature, humidity
  • Laser particle sensing
Particles, temperature, humidity
  • Laser particle sensor
Price
₹14,900
  • MRP ₹19,900
₹18,999
Room coverage
About 484 sq ft
  • 3 m ceiling
301–516 sq ft
Filtration
Dual filter, true HEPA
  • Air drawn in from both sides
  • Dry-clean pre-filter, activated carbon, anti-bacterial coating
True HEPA, activated carbon
  • No H-grade stated
Display
Round full-colour display
  • Four faces: full metrics, design, graphs, alerts
OLED touch display
  • Real-time PM2.5
App
Boon app
  • Schedules, alerts, diagnostics
Xiaomi Home app
Smart home
Google Home, Alexa (Apple HomeKit soon)
Alexa, Google Assistant

Xiaomi Smart Air Purifier 4 (AC-M16-SC), Dyson Purifier Cool PC1 (TP11) and Coway AirMega 150 (AP-1019C), compared on the figures and prices published on each brand's Indian website (mi.com/in, dyson.in, cowayindia.in) on 14 October 2026; prices change often. Dyson publishes no coverage area for the PC1, and its sensor list is from Dyson's India launch announcement of October 2025. Xiaomi, Dyson, MyDyson and Coway are trademarks of their respective owners.

Circle

Share Boon. You both get a filter free.

Refer a friend to their first Boon and you both win. They get a free Airvana filter in the box. You get one too. Every friend, every time, no limit.

Get Your Code
  1. Share your code

    Your private Boon Circle code is waiting in My Account. Share the code, never your phone number.

  2. They get a free Airvana filter

    Your friend enters your code at checkout on their first Boon Airvana™ order. A free Airvana filter ships in the box.

  3. You get one too

    Once their order is complete, a coupon for a free Airvana filter is added to your account and emailed to you.

Boon Airvana™, in numbers.

Full specifications for the Boon Airvana™ Smart Air Purifier
Performance
Room coverageAbout 484 sq ft (3 m ceiling)
AirflowDual-suction — air drawn in from both sides
ModesAuto (fan follows real-time AQI), Sleep, Eco
Fan speeds4 levels
Filtration
Filter systemDual filter, 4 layers: dry-clean pre-filter, anti-bacterial coating, true HEPA, activated carbon
Filtration stages4
Stage 1Pre-filter mesh (cleaned with a dry cloth)
Stage 2True HEPA filter
Stage 3Activated carbon
Stage 4Anti-bacterial coating
Filter life2X longer than a standard single-filter purifier
Sensing
SensorAtmoScan™ Level 8: PM1, PM2.5, PM10, VOC, eCO₂ (estimated), NO₂, temperature, humidity — read every second
ParticlesPM1.0, PM2.5, PM10 — laser-based
GasesTVOC, eCO₂, NO₂
ClimateTemperature, humidity
Smart alertsFresh air (eCO₂), cooking fume (TVOC), traffic pollution (NO₂), allergy (PM2.5 & PM10), clean pre-filter, filter change
Display & app
DisplayFull-colour LED display
Watch facesFull metrics, design (AQI only), AQI graph, plus a High AQI alert screen
On-unit controlsPower, mode, fan speed, timer, display face, child lock, Wi-Fi pairing
DiagnosticsContinuous self-check of sensors, filters and motor
AppBoon app — modes, scheduling, child lock, alerts, Auto-learn mode, diagnostics, insight cards
Smart homeGoogle Home, Amazon Alexa; Apple HomeKit expected soon
ConnectivityWi-Fi, 2.4 GHz
In the box
Warranty7 years on the motor, 1 year on electrical parts — send-in service from Boon

Manufactured & marketed by Swajal Water Pvt. Ltd., GP 61, Sector 18, Sarhol, Gurugram, Haryana, India – 122015. Country of origin: India.

No installation needed.

Plug it in, press and hold to pair with the Boon app and you're breathing better.

Questions, answered.

Up to about 484 sq ft. For an open-plan space larger than about 484 sq ft, two units placed apart usually do better than one — the size calculator works it out for your room.

It's the top of an 8-level sensing ladder. Level 1 is a basic dust sensor with an indicator light. Each level adds a reading, until Level 8 covers PM1, PM2.5, PM10, temperature, humidity, VOCs, CO₂ and NO₂.

Yes. True HEPA captures 99.95% of particles in a single pass. 'HEPA-type' is a marketing term with no standard behind it. Look for a stated HEPA grade alongside a stated CADR — a fine filter behind a weak fan still cannot clean a large room.

Yes. Touch buttons on top handle every mode, fan speed and display face. They also cover power, a timer, child lock and Wi-Fi pairing — press and hold for 3 seconds for the last two. The app adds scheduling, alerts, diagnostics reports and insight cards.

Airvana™ tracks filter health live and reminds you before a change is due. A separate reminder tells you when the pre-filter needs a wipe with a dry cloth.

7 years on the motor and 1 year on electrical parts, with send-in service from Boon: if something goes wrong, you send the unit to Boon's office and our team reviews it, then repairs or replaces what is covered. Filters are consumables and are not covered. The full terms are on the warranty page.

Yes. In Delhi NCR, Boon Airvana™ is delivered the same day, within 2 business hours of your order, and you can pay cash on delivery. Everywhere else in India it ships free.

Eight things, every second: PM1.0, PM2.5 and PM10 (fine to coarse particles), TVOCs (volatile organic compounds), NO₂ (nitrogen dioxide), eCO₂ (estimated carbon dioxide), temperature and humidity. Purifier sensing comes in eight levels, from a basic dust sensor (Level 1) to laser particle counting with temperature, humidity, VOCs, CO₂ and NO₂ (Level 8). Airvana™ is India's first air purifier with a Level 8 sensor — in effect a complete air-quality monitor built into the purifier. The bottom levels are a basic dust sensor or a single infrared PM2.5 reading, which is where most purifiers sit; neither says anything about a stuffy room, cooking fumes or traffic exhaust.

Seven, on the display and in the app. Fresh air (eCO₂) tells you when CO₂ builds up in a closed room. Cooking fume (TVOC) fires when VOCs spike. Traffic pollution (NO₂) flags exhaust drifting in from the road. Allergy (PM2.5 and PM10) warns when fine and coarse particles like dust and pollen rise. Filter health is tracked live, with a reminder before a change is due; a second reminder tells you to clean the pre-filter. And self-diagnostics check every sensor, every filter and the motor, with an alert the moment anything fails.

Not specifically. Particle sensors measure the size of what is in the air, not what it is made of, so no purifier's sensor can identify pollen. Airvana™'s allergy alert warns when fine (PM2.5) and coarse (PM10) particles — the size range that includes dust and pollen — rise in the room.

Airvana™ draws air in from both sides, through two filters instead of one — India's first dual-filter system. Two intakes clean a room faster and more evenly, and the dust a room produces is shared across two filters, so the system lasts 2X longer than a standard single-filter purifier.

A reusable pre-filter mesh that traps large dust particles and hair, cleaned with a dry cloth; a true HEPA filter for fine particles; activated carbon for gases and odours; and an anti-bacterial coating on the filter.

The dual-filter system lasts 2X longer than a standard single-filter purifier. How many months that is depends on the air it is cleaning, so Airvana™ does not leave it to a calendar: it sends a filter change reminder when the filter is due, and a separate reminder to clean the pre-filter.

Do not wash it. The pre-filter is a reusable mesh that you clean with a dry cloth: take it out, wipe the dust and hair off, and put it back. It traps large dust particles and hair before they reach the main filter, which is what extends the main filter's life — and Airvana™ reminds you when it needs cleaning.

Auto adjusts the fan speed automatically to the real-time AQI. Sleep runs quietly, with as little disturbance as possible, for the night. Eco cycles the purifier off and on as the AQI settles or rises, to save electricity.

Yes. Airvana™ runs continuous self-diagnostics on its sensors, filters and motor, and catches a fault the moment it appears — before it becomes a bigger problem.

Airvana™ works with Google Home and Amazon Alexa today. Apple HomeKit support is expected soon.

Everything the unit does, from your phone: switch modes, set the child lock, schedule the purifier and get alerts the moment your air changes. It runs diagnostics with a clear report on demand, and shows charts, trends and shareable insight cards on your home's air. Auto-learn mode learns your routine and starts purifying before you get home.

Boon Airvana™ is on sale now at helloboon.com, from this page. The price in the buy box is the live price, and checkout is on helloboon.com.

What owners say

4.92 out of 5 · 74 reviews

★★★★★

I was sceptical about smart features, but the app is genuinely useful and not cluttered. Thank you Boon.
Krishna Banerjee ·

★★★★★

Kolkata winter smog gets into our flat. Airvana keeps our bedroom fresh through the night. Happy customer.
Ananya Reddy ·

★★★★★

The device keeps checking itself and the app shows all green. Reassuring to know it is working right.
Ritu Pillai ·

★★★★★

Honest review after daily use. Child lock on the unit stops my toddler from pressing buttons. Simple but necessary.
Arun Kapoor ·

★★★★★

Honest review after daily use. Eight sensors and you can see all of them. PM1, PM2.5, PM10, VOC, NO2, everything right on the screen. Five stars.
Uma Chatterjee ·

★★★★★

Eco mode keeps it running efficiently during the day when the air is already clean.
Zoya Khanna ·

★★★★★

Built by an Indian team who understands Indian pollution. Pollution season in Delhi is so much easier now.
Ravi Agarwal ·

★★★★★

Pollution season sorted. Washable pre-filter means I just rinse it and put it back. Saves money on filters.
Akash Agarwal ·

★★★★★

Simply loved it. Temperature and humidity readings are a bonus. I do not need a separate weather station now. Five stars.
Anjali Khan ·

★★★★★

The eCO2 reading told me our bedroom gets stuffy at night. Now we open the window a little after it alerts us. Value for money.
Nandini Goyal ·

★★★★★

Excellent air purifier. Sleek white body, bright display, and quiet. Looks premium on our side table.
Imran Srinivasan ·

★★★★★

Delhi AQI crossed 400 last week and Airvana brought our bedroom down to under 30 in about 20 minutes. I watched it happen on the display.
Shruti Gupta ·

★★★★★

My mother has asthma and the PM2.5 at home is now always in the green. Huge relief for us. Five stars.
Akash Singh ·

★★★★★

Google Home integration works flawlessly. Added it to my bedtime routine.
Simran Banerjee ·

★★★★★

Works with Alexa, so I just say turn on the air purifier when I enter the room. Love it.
Jayant Malhotra ·

★★★★★

Boon support answered my question about filter cleaning within minutes on WhatsApp. Go for it without a second thought.
Nisha Mukherjee ·

★★★★★

Smart alerts for fresh air are useful. It tells us when to ventilate instead of just running the fan.
Tarun Saxena ·

★★★★★

Bought one for the bedroom and now ordering a second for the living room. Results are that good. Go for it without a second thought.
Sunil Kaur ·

★★★★★

Honest review after daily use. The design watch face shows just the AQI in a big number. My parents prefer that view. Five stars.
Revathi Bhat ·

★★★★★

Auto mode is the best. Fan speeds up when I start cooking and settles down once the air is clean. Value for money.
Mary Kamath ·

Shipping, installation and returns

How long does delivery take?

Boon Airvana™ ships free to every serviceable pin code in India. Orders are processed within 1–2 business days of payment, then delivered in:

Estimated delivery time for Boon Airvana™ by region
RegionDelivery
Delhi NCR2–4 business days
Metro cities (Mumbai, Bangalore, Chennai, Hyderabad, Kolkata, Pune)4–7 business days
Rest of India7–10 business days

Business days are Monday to Saturday, excluding public holidays. Remote pin codes can take longer; we keep you updated on WhatsApp.

Same-day delivery in Delhi NCR

In Delhi NCR, Boon Airvana™ is delivered the same day, within 2 business hours of your order, and you can pay cash on delivery.

Is installation included?

Boon Airvana™ needs no installation: take it out of the box, plug it in and switch it on.

Can I return Boon Airvana™?

Only for a manufacturing defect, reported within 10 days of delivery with your order number and a photo or short video. Once the defect is confirmed we refund or replace the unit, and refunds reach your original payment method within 7–10 business days. It cannot be returned for a change of mind; after 10 days the warranty applies.

Clean air, sorted. Now the water.

Boon's water purifiers bring the same intelligence to every glass.